Cheongju mixed-use complex finished with thin ceramic facade panels

DFP SYSTEM · HYBRID SPRING ANCHOR SYSTEM

A new standard for
thin ceramic facade systems.

BUILD SAFER. BUILD SMARTER.

바로가기
+ EXPLORE THIN CERAMIC

Find the information
you need.

Explore projects, system technology, ceramic materials and company information on dedicated pages.

Higher architectural value,
engineered into every facade.

Selected thin ceramic facade projects across commercial, office, residential and mixed-use architecture.

Commercial · Ceramic Facade

Nonhyeon ASTY

Residential · Ceramic Facade

Samsung Hillstate

Residential · Exterior View

Samsung Hillstate · Exterior

Residential · Courtyard View

Samsung Hillstate · Courtyard

Office · Ceramic Facade

Seongsu Office

Mixed-use · Ceramic Facade

Cheongju Terminal Complex

HYBRID SPRING ANCHOR SYSTEM

Dual-layer safety,
engineered as one system.

A factory-built OSC facade module combining structural sealant for dynamic loads, mechanical spring-anchor fixing in undercut holes, and cushioning sealant for controlled panel contact.

Each component carries the load it is designed for, improving safety, consistency and installation quality for 6 mm thin ceramic panels.

Mechanical fixing + chemical bondingTruss-integrated OSC moduleSpring-anchor dead-load supportCushioned panel protection

DUAL SAFETY MECHANISM

Two core components.
One integrated safety structure.

The spring anchor mechanically supports the panel at the undercut hole. The hybrid anchor plate connects the panel to the truss while structural and cushioning sealants distribute dynamic loads and local stress.

03-1 · ASSEMBLY SEQUENCE

HOW IT WORKS

See the spring-anchor
assembly in 23 seconds.

The film shows how the spring anchor is inserted into the ceramic undercut hole and connected to the hybrid anchor plate.

01 INSERT ANCHOR02 SEAT SPRING03 FASTEN PLATE
ASSEMBLY FILM · AUTOPLAY MUTED00:23
03-2 · MECHANICAL FIXING

Spring Anchor

Inserted into a non-penetrating undercut hole, the anchor expands and locks the thin ceramic panel mechanically to help control pull-out and detachment risk.

03-3 · LOAD DISTRIBUTION

Hybrid Anchor Plate

The plate connects the spring anchor to the aluminium truss and distributes loads across a broad contact area.

Cushioning sealantAbsorbs vibration and impact while reducing local stress around the anchor.

Structural sealantTransfers wind and dynamic loads between the ceramic panel and the truss.

Remove the site truss.
Reduce installation to one step.

Both systems use factory-made facade panels. The difference is the site truss: the conventional AL frame requires a separate site-built truss, while the Hybrid Spring Anchor module integrates the truss at the factory.

OSC MODULAR

Hybrid Spring Anchor System

FACTORYCeramic + anchor plate
+ integrated truss
Complete module
SITEInstall complete moduleSingle installation step
FACTORY INTEGRATIONPanel + anchor plate + truss
CONVENTIONAL

AL. Frame Panel System

FACTORYCeramic + AL. frame assemblyAL. frame panel production
SITEInstall subframe trussOn-site support structure
SITEInstall AL. frame panelOn-site panel fixing
SITE REASSEMBLYAL frame panel + site truss
KEY COST DRIVER

Hybrid Spring AnchorInstall complete module→Fewer site steps · lower cost

AL. Frame PanelInstall site truss→Install frame panel

EXPECTED EFFECTS

Benefits of the
Hybrid Spring Anchor System

Factory integration improves panel safety, quality consistency and site productivity while reducing field operations.

01 · REMOVE ON-SITE TRUSS

Eliminate the site-truss process

The truss is integrated with the panel at the factory.

02 · FEWER SITE STEPS

Move from two installation steps to one

A complete module replaces separate truss and panel installation.

03 · COST REDUCTION

Reduce direct and indirect project cost

Less labor, equipment and high-level work shorten the schedule.

04 · CONTROLLED QUALITY

Improve consistency and installation stability

Assembly and inspection take place under controlled factory conditions.

MULTI-BRAND MATERIAL SELECTION · 5.6–6MM

Select the right format
and design for every project.

Even within the same 6 mm class,
panel yield and total cost vary by slab size.

DFP SYSTEM evaluates module dimensions, design, performance and supply conditions before selecting the most efficient European, Chinese or global thin ceramic material.

DFP MATERIAL-TO-SYSTEM

Choose the material.
Complete it as a system.

MATERIAL · FORMAT · MODULE

01MATERIAL

Material and design selection

Review surface, color, texture and performance against the facade concept.

02FORMAT

Production-format optimization

Compare module and slab dimensions to control yield, waste and total cost.

03MODULE

Complete module production

Validate ceramic, plate and truss as one facade system.

DFP QUALITY GATE

Technical documentation · sample processing · Hybrid Spring Anchor compatibility

Facade engineering that connects technology with the construction site.

DAEDONG FE · DFP SYSTEM

ENGINEERING TRUST SINCE 1982

More than four decades
of engineering progress.

Established in 1982, Daedong FE has developed facade panel technologies through field experience, patents, certification and global projects.

GLOBAL EXPANSION

2024—2026

Taking patented facade engineering into international markets.

202602
GLOBAL

Vietnam Long Thanh International Airport

Export of products incorporating the Spring Anchor System

202512
GLOBAL

First overseas Spring Anchor export

Alma Inn Bank project, Saudi Arabia

198208
FOUNDATION

Company established

The beginning of Daedong FE

VERTICALLY INTEGRATED PRODUCTION

From fabrication
to completed facade panels.

Daedong FE operates an integrated production system in Pocheon, connecting metal processing, component manufacturing, truss fabrication, unit-panel assembly, inspection and shipment.

FACTORY CAPABILITY

Facade unit panels,
completed in Pocheon.

Since 1997, the Pocheon production base has supported the manufacture of metal, ceramic, brick and other facade unit panels and their connecting components.

CERAMIC UNIT PANEL ASSEMBLY · POCHEON FACTORY
Facade unit panels ready for shipment

FROM FACTORY TO SITE

Completed quality,
delivered to the site.

Factory-assembled and inspected unit panels are packed and shipped in installation sequence to reduce site work and construction time.
FACTORY QUALITY CONTROLREDUCED ON-SITE WORKFASTER INSTALLATION